The Dream Home Group
Delivery of Your Dream Home
7
To ensure a seamless schedule for the delivery process; a final deposit is required prior to shipping. This allows The Dream Home Group to lock in dates as well as times for the delivery. Our unique staging of deliveries is common practice for The Dream Home Group, this reduces the risk of the and weather damage, due to material sitting idle, this also allows for greater mobility when accommodating smaller sites. At time of delivery, all materials are wrapped and labeled. Copies of material list and shop drawings are provided at time of delivery to assist in a timely and organized build. To ensure a timely and well-organized build, site preparation has begun at your location during the manufacturing process. Excavation and foundation construction is well underway in readiness for the first of the staged deliveries from The Dream Home Group. Once on site, a carefully planned assembly is executed with your Dream Package. From foundation to roof coverings, every aspect of the build is painstakingly executed with a high level of enthusiasm and precision. This attention to detail ensures your dream home comes to life with the high expectations anticipated with every Dream Group Home. Bringing It All Together 8
Construction & Design Drawings
5
A er receiving a signed contract, we require a 25% deposit to move forward with construction and design drawings. These drawings include: elevations, structural plans, cross sections, framing plans, & details all Building Code Certified. All blue prints are fully engineered where required to ensure solid, stable, long lasting structures. This process takes 4-6 weeks depending on complexity.
Manufacturing & Material Organizing
6
Once a final approval of the plans have been received, we require a 25% deposit to set your project into the schedule to begin the manufacturing of the large timber components as well as organizing materials for your dream home. During the process of manufacturing you are invited to view our progress. Manufacturing timelines are dependent on the time of year, as well as expected delivery dates for your project.
Made with FlippingBook - Online catalogs